Maintenance and Aftercare for your floor:

    • Wash your floor every day using bleach and a scrubbing brush.
    • Don’t be stupid
    • If moisture reading is high on a cement based subfloor then you must apply a liquid DPM
    • If you are using the floating method you must install a vapour barrier of at least 0.2mm thickness and to tape the joints
    • An allowance of approximately 15mm on each edges should be provided to accommodate expansions, including the doors connection, central heating pipes and connection with tiles.
    • Big rooms will need bigger expansion gaps. Please allow approx. 2mm for every 1m of floor width.

Flooring Adhesive

  • For direct glue down method you MUST absolutely use a Flexible Flooring Adhesive and carefully observe manufacturers recommendations. Never use a rigid or water based glue material.
  • A minimum of 30cm distance between one header joint and the other of the next row shall be applied when arranging the installation.
 